Trade Person Code of Conduct
Below
is the Tradesperson code of conduct
I think most things are
covered elsewhere but I’ve attached all my thoughts here for your
consideration.
What Tradybay Expects from
Trade People
The Tradybay Mission is to Connect Customers with Trade People with
an Unbiased Fair Environment for Both Parties to Enjoy. To Create this
Environment and Ensure a Good Trade Person Rating, we Require our members to
Consider the Following.
Presentation
- Trade
People Must Be Polite and Courteous to Customers.
- Trade
People should be able to communicate with Customers, so Customers
understand what you are trying to achieve and where necessary, problems
and delays.
- Trade
People should look Clean and Fresh to the start of a Job. Bad Hygiene is
not Acceptable.
- Trade
People Should Not Use Bad Language. Some Customers Use Bad Language, this
must be approached using common sense. In a relaxed environment you can
Choose how you respond, BUT in a Dispute Bad Language can be used as a
Weapon against you.
- Trade
People should never Lose Their Temper in front of a customer. Please go
and sit in your Van if your feel a Temper Tantrum Coming On.
- The
Trade Person will make sure work and access area’s will be fully cleaned
and tidy as to the same standard as the start of the job unless stated in
job description. The Trade Person must take a picture if the work area is
already untidy or unclean or if there are marks on a carpet or furniture
etc.
Professional Approach
- Assess
the Job Upon Arrival to Make Sure the Price Given Is Correct.
- Trade
People Should Work to British Standards and everything will be in working
order and tested on completion of the work. Certificates should be given
where Necessary.
- Trade
People are expected to comply with all Health and Safety Laws and are
responsible for their own Health and Safety and are required to Comply
with Health and Safety Act 1974 and The Construction Design and Management
Regulations (CDM) 2015
- The
Trade Person will make sure work and access area’s will be fully cleaned
and tidy as to the same standard as the start of the job unless stated in
job description. The Trade Person must take a picture if the work or
access area is already untidy or unclean or if there are marks on a carpet
or furniture etc.
- Make
sure the Customer knows you need to give them consent to use new fitted
equipment, ensuring no Harm and/ or Damage is caused by incomplete work.
- Trade
People must get Consent to turn power off on any circuit. Consent is
Automatically given if the Customer is not present, and the Trade Person
has not been told to Not turn certain circuits off.
- All
Measurements are for pricing purposes only, the Trade Person must visit
the house for the final measurements (if measurements are essential to the
fitting of goods) before any goods are ordered. It should be taken that
all measurements on this site are estimates.
Fair View to all Situations
- When
the Trade Person quotes for a job he/she will quote for the worst-case
scenario and will not charge extra, unless work has been added onto what
has been quoted for, or incorrect information has been supplied.
- The
Trade Person can only charge extra If a job posted is incorrect (not
slightly out with a measurement) and the Trade Person has had extra costs
or time added he/she can negotiate with the customer using the trade
person’s extra’s list.
- The
Trade Person should contact the customer prior to the start date to make
sure there is no change. Wasted journey will only be compensated if the
customer does not respond to a call from the Trade Person (this must be
proved) a wasted journey will be on the extra’s list.
- Any
damage caused by a Trade Person fitting equipment wrong should be replaced
or put right by the Trade Person.
- If
the Trade Person damages the Customers or another Trade Person’s property,
the cost will be taken off the final payment if not sorted between the two
parties involved.
- If a
Trade Person has caused more work to be done (such as a plumber drilling
though electric cables) this will be deducted from job payment if it
cannot be sorted out on site.
- If a
Trade Person is causing a delay to another Trade Person and that Trade
can’t start their job as a result, the Trade Person causing the delay must
contact the other Trade Person/s to let them know of the problem at the
earliest time possible or can face a penalty.
- All
cost involved with running over the scheduled finish date will be covered
by the Trade Person (extra days on a hired piece of equipment i.e., toilet
hire drill hire etc.) Unless agreed with the customer first (and have
proof of the agreement).
- The
Trade Person Must put Right any Reasonable Problem at the Request of the
Customer before the Final Payment. This will be in Accordance with the Job
Post and User Agreement.
2 What Tradybay Does Not
Expect from Trade People
Bad Customers
- If A
Customer is Abusive and/ or you feel threatened in any way, Please Gather
Evidence and Make Safe the Work Area and Inform the Customer of the
Problem. If you Leave the Job, we will work With You to Come to fair
Solution to the Situation.
- If a
customer is not at the Agreed location at the Time Agreed. Please Try to
Contact the Customer and Give Time for any delay. If you wait for 1 hour
you can be Compensated for a waisted Journey. Your Trade Person Price List
will state how much should be charged.
Bad Information Given.
- Trade
people Are Not Responsible for Completion of any job priced for when the
Job Post has incorrect information causing a significant price difference.
This Must Be Assessed immediately at the start of the Job to Try and Sort
ASAP.
- The
Trade Person is Not Responsible for supplying a Higher Standard of Goods
if it has not been stated. I.e., the Customer wants Chrome Fittings not
Basic.
- Moving
equipment/ materials which has been fitted if the customer changes their
mind or has not stated the position before the work has started.
Inheriting Customers
Problems/ Previous Sub-Standard Work
- Trade
People Are Not Responsible for damage caused by previous substandard work
done.
- Trade
People Are Not Responsible for damaged caused by gaining entry to an
access point sealed/ glued back.
- Trade
People Are Not Responsible for damage to cables or pipe work hidden in a
wall or other space not in a safe zone or in line (horizontal or vertical)
with a visible entry into the wall or space.
- Trade
People Are Not Responsible for moving cables or pipe work in the way of
completing the job unless stated in the job description.
- Trade
People Are Not Responsible for any equipment supplied by the customer. If
faulty or wrong equipment is supplied by the customer and extra time is
taken by the Trade Person, this can be charged for as an extra.
- Electronic
equipment not turning on after the power has been turned off to work on.
This can happen when electrical equipment only ever goes to standby and
never turn off completely.